{
  "record_id": "790122eedacf4b06",
  "title": "WEBER KSV sanding machine | Hans WEBER Maschinenfabrik GmbH",
  "kind": "reference",
  "company": "Hans WEBER Maschinenfabrik",
  "parameters": {
    "Machine type": "Large-format industrial sanding machine",
    "Processing stations": "Up to 5",
    "Working widths": "6 options",
    "Processing direction": "Upper and lower frames",
    "Duty": "Continuous and multi-shift production",
    "Contact-roller drive": "Up to 160 kW by configuration",
    "Planing-shaft diameters": "180 or 240 mm",
    "Cross-belt drive": "15 kW",
    "Brush drive": "Up to 24 kW"
  },
  "summary": "WEBER KSV is a flexible industrial sanding platform for particularly large projects and continuous production. Six working-width choices, up to five stations and independent upper and lower frames support calibration, planing, fine sanding and two-sided processing.",
  "sections": [
    {
      "heading": "Large-format architecture",
      "paragraphs": [
        "KSV provides six width choices for panel and workpiece formats beyond compact production machines. A separate internal upper frame allows processing from above and below within the selected machine layout."
      ]
    },
    {
      "heading": "Heavy removal and calibration",
      "paragraphs": [
        "A planing unit with 180 or 240 mm shaft options can pre-machine solid wood and panel material at high removal rates. Contact rollers provide calibration and pre-sanding before pressure-beam or combination finishing."
      ]
    },
    {
      "heading": "Finish modules",
      "paragraphs": [
        "Cushion, combination and CBF units address sensitive or high-quality faces. Cross-belt, planetary and brushing stations manage grain direction, edge finish, texture and final cleaning."
      ]
    },
    {
      "heading": "Line integration",
      "paragraphs": [
        "The broad width and station range makes KSV configuration-specific. Part support, extraction volume, available motor power, abrasive belt dimensions and upper/lower datum strategy must be confirmed for the installed arrangement."
      ]
    }
  ],
  "updated_at": "2026-10-11 18:39:33"
}