{
  "title": "Ti Sic Fibers W 1117 Susp Plub — Composites and Reinforced Materials",
  "kind": "document",
  "company": "Struers",
  "category": "Lapping, honing & superfinishing",
  "parameters": {
    "Edition": "Listed by source",
    "Material family": "Composites and Reinforced Materials"
  },
  "language": "en",
  "source_url": "https://publications.struers.com/brochures/english/application-notes/methods/ti-sic-fibers-w-1117-susp-plubcomposites-and-reinforced-materials/",
  "content_html": "<p>Struers methods: Ti Sic Fibers W 1117 Susp Plub. Source classification: Composites and Reinforced Materials.</p><figure><img src=\"/files/struers-render-a110faa87db1f167ea143171/struers-doc-3810b5d9660e473fb004bd8d-1.png\" alt=\"Original preparation method, page 1\" loading=\"lazy\"><figcaption>Original method · Page 1</figcaption></figure><details><summary>Searchable text transcription</summary><p>The page images and original PDF preserve the table layout and notation.</p><pre style=\"white-space:pre-wrap;font-size:13px;line-height:1.6\">Ti + SiC fibers + W\n1117\nComposites and Reinforced Materials\nSusp. P/Lub.\nGrinding\nSteps\nPG\nFG\nSurface\nType\nSiC Foil #500\nMD-Largo\nDisc speed (rpm)\n300\n150\nAbrasive\nType \nDP-Susp. P 9 µm\nPredosing/dosing\n3/6\nLubricant\nType \nWater\nDP-Blue\nPredosing/dosing\n3/6\nForce (N)\n20\n40\nHolder direction\n&gt;&gt;\n&gt;&gt;\nHolder speed (rpm)\n150\n150\nTime (min)\n1\n6\nPolishing\nSteps\nDP\nOP\nSurface\nType\nMD-Dac\nMD-Chem\nDisc speed (rpm)\n150\n150\nAbrasive\nType \nDP-Susp. P 3 µm\nOP-S, 0.25 µm\nPredosing/dosing\n3/6\n1/10\nLubricant\nType \nDP-Blue\nPredosing/dosing\n3/10\nForce (N)\n30\n10\nHolder direction\n&gt;&gt;\n&gt;&lt;\nHolder speed (rpm)\n150\n150\nTime (min)\n8\n10\nThe method is developed to fit a standard equipment \nconfiguration with 30 mm specimen on 300mm disc. \nDosing levels are valid for following equipment: \nTegramin, AbraPol and LaboPol\nFor advice on how to adjust the method to fit your \nequipment, please take a look at Preparation Parameters.\nThe preparation time for the plane grinding (PG) step \ndepends very much on the condition of the samples and \nif they are prepared as single specimens or clamped in a \nspecimen holder. Please check the samples after the first \nstep and repeat it if necessary.\nMethod comments\nTake a look at Preparation Parameters \n</pre></details>",
  "summary": "Struers methods: Ti Sic Fibers W 1117 Susp Plub. Source classification: Composites and Reinforced Materials.",
  "sections": [],
  "updated_at": "2026-10-17"
}